Available Properties
052   runway cntr   water sewer 3
PDF

FLC Industrial Park - Lot 2 

Located in a master-planned industrial park, this site is directly served by US Highway 64, a major four-lane highway in southern Tennessee with access to Interstate 65. Here, you will find 17 acres prepared to accommodate future industrial development. Lot 2 is fully served by industrial-grade utilities, this site is well suited for numerous small to medium-sized industrial prospects.

Industrial Parks

The FLCIDB is the primary point of contact for the 520-acre Bullington and Fayetteville-Lincoln County Industrial Parks, currently under development. The site is slated to offer state-of-the-art amenities and infrastructure including frontage on four-lane US Highway 64, fiber optic cable, custom electrical configurations, natural gas lines, 8-inch water and sewer pipes and full ingress/egress. Tenants of the Bullington Park include Franke, C&S Plastics, Gregory Manufacturing and the Technology Center at Motlow State Community College. The plots vary in size from 8 to 56 acres, and can be adapted to any purpose.


Available Properties Information

SOLD -  Spec Building - SOLD

Construction is complete of a 320' x 250' Spec Building to provide industry an option to quickly locate in Fayetteville. This building is 80,000 sq. ft. and can be expanded to over 160,000 sq. ft. There are four dock doors with levelers. The column spacing is two 75' exterior bays with one 100' interior bay. The building has a sprinkler system, fiber, gas, water, and sewer.

This facility located 38 miles from Huntsville, AL and 65 miles from Nashville, TN is centrally located. Please contact FLCIDB with any questions.
PDF